1. Consultation (start here)
  2. Plan
  3. Ten phases
  4. Handoff
I·The Modern Hotel Launch · Openings and reopenings

You are about to open a hotel.
Who on your team has done that before?

Not managed one. Opened one. The two jobs have almost nothing in common, and the first one hands off to the second at the end.

I have opened eight hotels from concept to ribbon-cutting and repositioned four more. The Launch is the hands-on opening or reopening engagement: brand and budget to first guest, ten phases in the right order, on site nationwide, and a handoff to your general manager at the end. For the owner with a signed lease or purchase, a renovation under way, or a date on the calendar. Every Launch starts with a Plan. Quoted per project.

8 hotels opened from concept to ribbon-cutting · 4 repositioned · on site nationwide

Opened and reopened
$1.5M

year-one revenue at the Paloma, Palm Springs. Upscale boutique opening, featured in Travel & Leisure.

6.4 to 9.1

guest score at the Twist after a distressed turnaround and reopening, with 60% of bookings direct.

Limón

California. Upscale boutique launch, featured in Modernism Magazine.

Adam Ramirez
Adam Ramirez
Founder · on site with you

I have opened eight hotels from concept to ribbon-cutting, most of them in Palm Springs. I run your opening myself, on the property, in the same ten phases every time.

hotels opened
8
hotels opened
repositioned
4
repositioned
revenue a year managed
$10M+
revenue a year managed
funded feasibility projects
6
funded feasibility projects
Read Adam's story
Book an Opening ConsultationOpen a hotel in five minutes first

Fifteen minutes on the stage, the budget and the date. If a Launch is not the right size for the project, I will say so.

III·How to open a hotel

Ten phases.
All of them in the right order.

The contractor has a schedule. The business does not. The best openings feel inevitable and never are: the name before the budget, the budget before the systems, the systems before the hiring, the booking sites live in month two so the hotel is selling rooms before the paint dries.

A typical Launch runs 90 to 270 days from contract to ribbon-cutting. The range moves with the property's size, the brand and the scope, so treat it as a planning range, not a promise. Tap a phase to see what happens, what goes wrong when it is skipped, and what you hold at the end.

  1. IConcept and positioning
    What happens

    The name, the voice, the design intent, the hotels you will be compared with, the rate you are building toward.

    When it is skipped

    The design gets chosen before the guest, and the rate the budget needs never shows up.

    What you hold

    The written opening plan: the market, the concept and the positioning in one document.

  2. IIBrand identity and creative direction
    What happens

    Logo, brand book, the photography brief, naming conventions for every room and space.

    When it is skipped

    The signs, the website and the photos get redone after opening, at full price.

    What you hold

    The brand book and the photo brief.

  3. IIIPre-opening budget and year-one model
    What happens

    Build cost, furniture and equipment, the ramp to stabilized occupancy, the first year's profit and loss. Carried in from the Plan.

    When it is skipped

    The money runs out between the last contractor and the first guest.

    What you hold

    The opening budget and the live financial model, line by line.

  4. IVSystems selection and setup
    What happens

    Property management, revenue management (Duetto, Lighthouse or Hotelitix, our three partners), channel manager, booking engine, guest database, point of sale, keys. Chosen so they talk to each other.

    When it is skipped

    Five systems that do not talk to each other, and a front desk that types everything twice.

    What you hold

    Every system set up in your name, with the logins handed to you.

  5. VSales and distribution build
    What happens

    Booking-site contracts, Google hotel listing, group and corporate channels, live early so the hotel sells before it opens.

    When it is skipped

    The doors open to an empty calendar, because the booking sites went live the week of opening.

    What you hold

    Booking sites, Google and group channels selling before the first night.

  6. VIHiring plan and org chart
    What happens

    Leadership first, then the line, then training. The people who will run the hotel are in the building before the guests are.

    When it is skipped

    The team meets the hotel and the guests on the same day.

    What you hold

    The labor budget and the org chart: every position, hours, wage and burden.

  7. VIIStandards and training
    What happens

    Front-of-house manuals, service standards, brand standards, food and beverage. Written by the person who will train the team.

    When it is skipped

    Every shift does it a different way, and the reviews say so.

    What you hold

    Manuals and service standards written for your hotel.

  8. VIIIMarketing launch
    What happens

    Press, paid media, the website and booking engine, the pre-launch email list.

    When it is skipped

    Opening day is a secret.

    What you hold

    The launch plan: press, paid media and the first email list.

  9. IXSoft opening
    What happens

    Guests in the rooms, a debrief every day, fixes made before the public sees them.

    When it is skipped

    The first paying guests find the problems, and write about them.

    What you hold

    A daily fix list, closed before the public opening.

  10. XPublic opening and handoff
    What happens

    The ribbon, then the handoff to your general manager and to Revenue Management Services, so the revenue work does not stop the day the Launch ends.

    When it is skipped

    The pricing stops the day the consultant leaves.

    What you hold

    Everything documented in your name, handed to your manager and your revenue manager.

IV·Your opening, on your phone

A private portal
for every Launch.

You never have to ask where the opening stands. Every Launch client signs in to a private portal that shows the whole project, what waits on you, and what is ready for your OK.

One wheel for the whole opening
Every project fills its own wheel: in progress, 25%, 50%, final systems check, then ready for your OK.
What only you can do
The decisions and steps that wait on you, with why each one matters, at the top of the page.
Ready for your OK
When a project is done, it comes to you with the test it had to pass, written in plain words.
Every update, in writing
News lands on the page and in your inbox, so nothing lives only in a phone call.
The client's Launch page: one wheel for the whole opening, the six phases, and what only the owner can do
Where things stand: a wheel for every project, with its status and its day
A live Launch, October 2026. The owner's details are blurred.
IV.b·Learn by playing

Open a hotel in five minutes. Then open yours.

You bought a hotel and it opens in 90 days. Pick your guest, build, set up your systems, hire, market and cut the ribbon. Every choice costs money and days, and the phone buzzes when guests notice. At the end you see your hotel set up, and the same ten phases above, in the order a real opening walks them.

Money to get open
$760,000
38 rooms · desert motel
Days left
90
the clock starts when you do
Stage 4 of 10
Your systems
front desk on paper, 9-minute check-in

A learning tool, not a toy. Free, no sign-up. At the end: your opening score, explained in dollars, and your hotel set up piece by piece.

V·How it runs

Plan first. Then the Launch.

01
The consultation

Fifteen minutes on the project: the stage it is at, the budget, the date, and whether a Launch is the right size for it.

02
The Modern Hotel Plan

One flat fee, quoted up front. The demand, the math and the value, so the Launch is built on numbers that hold. If you already have a Plan from us, this step is done.

03
The Launch, quoted

Scope, phases and the monthly fee, quoted per project after the Plan. On site nationwide.

04
The handoff

Your general manager runs the hotel. Revenue Management Services runs the revenue. The Launch team leaves with everything documented in your name.

What the Launch is not

It is not a management contract, and it does not run the hotel after opening. It is the opening, done in the right order, and then handed to the people who will live there.

Ten phases, on site nationwide, run by an operator who has opened eight hotels from concept to ribbon-cutting.

VI·Already open

The reset that
beat the renovation.

Some hotels do not need construction. They need a reset: the brand, the team, the pricing, the systems and the booking sites, done at once, ending in a relaunch. The Launch covers this too, for a property that is open and underperforming. Twist was a reset before it was a reopening.

VII·What you hold at the end

Everything documented,
in your name.

Every Launch produces the same shelf of documents, built on your property and kept live until the ribbon.

The written opening plan, the live model, the opening and labor budgets, the brief for the city and five more.

The brief for the city, the $786,500 improvements program and the $585,000 labor budget, from the delivered Plan.

VIII·Who does the work

Adam Ramirez.
Operator first.

Adam has spent 10+ years opening, repositioning and running independent and boutique hotels, many of them in Palm Springs, and still prices hotels every morning. Ramirez Hospitality Group is how an owner gets that work without hiring for it.

The method is the product and it lives in your own accounts: every rate plan, rule and piece of data belongs to you. A second contact is named on every account. If you wanted to take it over tomorrow, you could.

Properties opened, repositioned, or run
  • ·The Paloma Resort
  • ·Twist Palm Springs
  • ·Limón Palm Springs
  • ·Sands Hotel & Spa
  • ·The Stardust
  • ·Dunes Palm Springs
  • ·The Creekstone Inn
  • ·Town & Desert Hospitality
  • ·Bellevue Oasis
  • ·Float Palm Springs
  • ·Saguaro Hotel
  • ·8 hotels opened from concept to ribbon-cutting
  • ·4 properties repositioned after renovation or ownership transition
  • ·50+ independent and boutique hospitality properties worked with
  • ·$10M+ in annual hotel revenue managed
  • ·6 funded feasibility projects with full pro formas
IX·Common questions

Asked by owners,
answered plainly.

I have a general manager for that.

A general manager runs a hotel that exists. An opening is a different job: ten phases in the right order, from the name and the budget to the first guest, and it hands off to the manager at the end.

How far in advance should we talk?

Before the name and the positioning are locked, ideally, because that decision drives the budget, the systems and the hiring plan. We have also stepped into projects mid-construction. Bring the schedule to the consultation and we will tell you what is still open to change.

How long does it take to open a hotel?

A typical Launch runs 90 to 270 days from contract to ribbon-cutting. The range moves with the property's size, the brand and the scope, so treat it as a planning range, not a promise.

What does the Launch cost?

It is quoted per project, after the Plan, because the scope moves with the property. The Plan itself is one flat fee, quoted up front, and every Launch starts with one.

How will I know where the project stands?

Every Launch client gets a private portal: a wheel for the whole opening and one for every project, the decisions that wait on you, and every update in writing. You can check it on your phone any time.

We are repositioning an open property, not opening a new one.

The reset is the same discipline, compressed: positioning, the model, the systems, the pricing and the booking sites, then a relaunch. Four of the hotels on the track record were repositioned this way.

What happens after we open?

The revenue work continues as Revenue Management Services, so daily pricing and the booking sites never lapse. Your general manager runs the hotel.

X·Next step

Tell me about
the project.

Five fields, then pick a time for a 15-minute consultation.

Book an Opening Consultation

Fifteen minutes on the stage, the budget and the date. If a Launch is not the right size for the project, I will say so.

Text consent is optional. The Launch is quoted per project after the Plan.

Ramirez·Hospitality
By Adam Ramirez

Operator-led revenue and opening consultancy for independent and boutique hotels, motels and inns.

760-969-9249
[email protected]
351 E Via Carisma, Palm Springs, CA 92264 · Working nationwide
Begin
Book an Opening Consultation

Mon–Fri 8a–6p PT · Weekends by appointment

Ramirez Hospitality Group is an operator-led revenue and opening consultancy for independent and boutique hotels, motels and inns, based in Palm Springs, California and working nationwide. Three offers: The Modern Hotel Audit (free, the hotel scored out of 100 across seven areas and sized in dollars); the revenue management subscription (three plans, Essentials, Growth and In-House, each a flat monthly fee, nothing on commission, no software included in the fee); and The Modern Hotel Plan (a flat-fee feasibility study, priced up front) followed by The Modern Hotel Launch (the opening and reopening engagement, quoted per project). Founded by Adam Ramirez: 10+ years · 50+ hospitality properties · 20% average revenue lift*; eight hotels opened from concept to ribbon-cutting, four repositioned, $10M+ in annual hotel revenue managed, six funded feasibility projects.

*At hotels that had never done revenue management before RHG set the rates.

© 2026 Ramirez Hospitality Group. All rights reserved.
PrivacyTermsEstd · 2023